Complete step-by-step instructions for perfect measurements & installations
Follow our comprehensive step-by-step guide to install your shutter with confidence.
Whether you're a DIY enthusiast or first-timer, we'll guide you through the process.
Have all the necessary tools and hardware ready before you start
Carefully follow each installation step in the correct order

Use protective equipment and ensure your workspace is safe

Power drill or screwdriver

Measuring tape

Pencil for marking

Spirit level

Step ladder (if needed)
Shows window frame detail
Requires sufficient recess depth

Hinge pins

Hinge packers

Drill hole covers

Magnetic receivers

Screws

Raw plugs

Packing wedges
Carefully open the packaging and lay out the contents on the floor. These will include: hinge pins to secure the panels, hinge packers, drill hole covers, magnetic receivers, screws, raw plugs and packing wedges.
To ensure that the frame is assembled correctly, each side is labelled left, right, bottom and top.
Position the frame pieces around the panels
To assemble the frame, slide each corner together
Once completed, lift the frame into position. For larger frames, this may require two people.
Centre the frame within the width of the recess. Using packing wedges to keep an even gap either side.
Next, mark the top screw holes on the left and right sides of the frame by screwing the top screws partially into the wall and then unscrewing them.
Once you have marked these two screw holes, push the frame away, drill the two holes and insert the raw plug.
Bring back the frame and screw the two top screw's part way into the holes. This will hold the frame in place and allow you to adjust the position.
Place all the other screws into the frame, ready to mark the screw holes once the frame is in the right position.
Each panel is marked alphabetically in sequence always starting from the left. For this two shutter panel: A is left and B is right. Ensure that they are the right way up with the label on the top edge.
Always make sure the vanes close upwards. Position A into the frame, then secure by sliding a hinge pin in each hinge. Then repeat with Panel B.
With the panels closed, move the frame left to right until the panels line up at the top.
Once you have done this, repeat the frame, open up the panels and mark the position of the screw holes by partially screwing in to mark the wall and withdraw the screws.
Now remove each of the hinge pins and carefully take the panels down. Release the top screws which have been holding the frame in place and carefully take the frame down.
Now begin to drill each of the marked screw holes. Place raw plugs in them. Bring the frame back and pack the frame in the same position as before, so that the drill holes align to the frame holes.
Screw the frame securely into the wall. Replace the panels as before securing with hinge pins.
Should you need to use the hinge packers supplied to make fine adjustments to the space between the two closed panels. You can also adjust the panels position vertically.
Now fully secure your hinges by tightening the screws and putting the final middle locking hinge screw in. For a clean finish, slide cover strip into the frame channel.
Using decorator's caulk, seal any gaps around the frame. You may also want to caulk the inside of the back of the frame. After you have caulked, use a wet wipe.
To close the vanes, push the tilt rod upwards. Then, applying light pressure, run your hand upwards from the bottom to fully close them. When closing the panels support the weight if the leading door, lift up slightly and place back into the frame.
To fold back two panels shutters, with the vanes tilted open, place your hand around the frame and pull towards you. Using the tilt rod, close the vanes and hold the panels back against the wall.
For shutters with two doors hinged together, it may be necessary to use the magnet receivers supplied. These will keep the open folded panels fastened together and reduce the likelihood of the doors creeping

Always double-check your measurements and bracket positions before drilling to avoid costly mistakes.
Having a second person assist can make installation easier, especially for larger shutters.
Don't rush the installation. A careful approach ensures better results and prevents errors.
Using the correct drill bit size and screwdriver prevents damage to brackets and screws.
Ensure the mounting surface can support the shutter's weight. Use appropriate wall plugs for your wall type.

After installation, operate the shutter several times to ensure smooth function before finishing.
Now that you have all the information you need, it's time to get started!
If you need assistance or have questions, our customer service team is here to help
Subscribe to get information about products and coupons

From the team behind Sienna Shutters
Knightsbridge Shutters is part of Fusion Blaze Limited, the company behind SiennaShutters.ie, one of Ireland's most trusted shutter specialists.
You can expect the same commitment to quality,
expertise and customer care with every
Knightsbridge shutter.


Address:
Fusion Blaze Limited trading as Knightsbridge Shutters
The Ward
Masspool,
Ashbourne,
County Meath,
D11 AVX7, Ireland.
Company Registration No.: 599919
VAT No.: IE3478982QH
Also trading as Sienna Shutters - siennashutters.ie
Email: support@knightsbridgeshutters.ie
Phone: 01 5314943

NEW NAME. PROVEN EXPERIENCE.
Knightsbridge Shutters is from the team behind SiennaShutters.ie-trusted by customers across Ireland.





Read our Sienna Shutters
Customer reviews

Pround to support Irish jobs and local business.
PAYMENTS ACCEPTED:
© Knightshutter Shutters 2026. All Rights Reserved.
Powered by: Flowrix